Saturday, August 15, 2020

Updating the Solar System - Part 2

 Part 2. Replacing the wiring

The existing wiring to the panels is primarily duel cable 10awg wire. The wires are attached to the terminal blocks inside the Panel Terminal boxes using twisted wire inserts. Those connections need to be correctly terminated.

In order to maintain consistent wiring practice between all three panels, the panels will connect to T branch connectors. This means that each panel will have a pair of wires from the terminal box to the T branch connector.
This means that the new panel can be installed at any time and thus allow completion of the system in advance of the arrival of the 3rd panel.

The good news is that the Solar Panel was due between September 13 - 19th, Amazon sent an update today stating that it would arrive between August 13 - 19th. That's next week WooHoo!

The Cable Gland kit from Amazon should have the appropriate size glands to create a waterproof insertion point for the 10AWG cables into the Panel Terminal Boxes.


Just so that it's obvious in 2030 - This is another of the boat projects that is being done during the 2020 Pandemic of Covid19. There's a degree of excitement about the work, it gets us out of the house and should improve the power system on the boat. We're going from 350 watts of solar power that we were told was on the boat when we bought her, to finding that we only had 230 watts of solar panels and then 130 watts after finding that the largest, 100watt, panel is defective. We should end up with 300 watts of solar with a max current of 3.69 amps + 3.59 amps +9.44 amps = 16.82 amps - but it will never get that high. I should be able to get 10 amps when needed.  Of course, the other benefit is that the wiring will be top grade, very reliable and, most importantly as far as satisfaction is concerned, we'll be able to monitor the Solar system which is something we cannot do right now. It's good to know that things are working correctly.


Update Saturday August 15th.

Made good progress today:- After removing the defective panel yesterday, today we worked on the wiring. Once I had detached the cables from the Blue Sky Solar Controller and traced them up into the aft end of the Nav Area covered shelving, Peggy started snipping the tiwraps that held the cables to the loom in the bathroom. Meanwhile, I removed the wires from the remaining two panels and extracted the main wire from the Panel mounting down to the Port Side Combing where it passes into the area inside of the Port Side Cockpit Locker

Once inside the locker, I was able to see where the cable came into it. There has to be a hundred tiwraps holding the loom together and to the large Exhaust pipe that reaches up to the top of the locker.










Just as we have found virtually everywhere in the boat electrical system, the Solar Panel Power wire has multiple connections, one was a 4 screw chocolate block and another was the dreaded twist, solder and cover with sticky electrical tape.

The new wire from the panels will be two pieces of continuous 10AWG wire.

While in the locker I was able to see the original Catalina Wiring for the Stern light glassed into the underside of the Combing area. 

As we make further improvements to the boat, I'm sure we'll fix the rest of the wiring in that area, I cannot think what it must all be for? I replaced the Engine Harness wiring a couple of years ago, so I know that's good.





With a heavy rain cloud in sight heading our way, we quickly stowed the locker contents and closed up the boat. By that time we had the cable double cable entry gland installed and the cables from the solar panels lead all the way into the Port side Locker. Monday we should be able to complete the wiring of the panels and the installation of the new Victron MPPT Solar controller.

When we got home, there was a pile of stuff from Amazon waiting on our doorstep. The Controller, Battery Smart Sense unit, 30 amp circuit breaker/switch, and the box of cable glands.
The only thing left to arrive is the new 170 Watt panel.

Part 3 should conclude this project. We're planning on a sailing trip next weekend the 22nd of August, so no pressure !!!

See you on the water.

Paul


No comments: